Agilent Technologies Weather Radio 1680 Instrukcja Użytkownika Strona 21

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 20
21
Chapter 3: Testing Performance
To make the test connectors
To make the test connectors
The test connectors connect the logic analyzer to the test equipment.
Materials Required
1 Build four test connectors using BNC connectors and 6-by-2 sections of
Berg strip:
a Solder a jumper wire to all pins on one side of the Berg strip.
b Solder a jumper wire to all pins on the other side of the Berg strip.
c Solder two resistors to the Berg strip, one at each end between the end
pins.
d Solder the center of the BNC connector to the center pin of one row on
the Berg strip.
e Solder the ground tab of the BNC connector to the center pin of the
other row on the Berg strip.
Description Recommended Part Qty
BNC (f) Connector 1250-0698 5
100 1% resistor 0698-7212 8
Berg Strip, 17-by-2 1
Berg Strip, 6-by-2 4
20:1 Probe 54006A 2
Jumper wire
Przeglądanie stron 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 173 174

Komentarze do niniejszej Instrukcji

Brak uwag