Agilent Technologies DisplayPort Instrukcja Użytkownika Strona 9

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 56
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 8
Agilent Technologies, Inc.
DisplayPort Test Implementation Group 9 Agilent J-BERT N4903B & 90000A/X/Q Series Sink Draft2
Sink Jitter Tolerance Test (4.1)
6 Pre-test Procedures:
Prior to making any measurements, the following steps must be taken to assure accurate measurements:
Allow a minimum of 45 minutes warm-up time for oscilloscope and J-BERT N4903B
Ensure the oscilloscope and skew is calibrated per Agilent’s user documentation on calibration.
Make sure you use a torque wrench with the proper torque specification to make all SMA connections.
7 Test Objective
The DisplayPort PHY CTS 1.2b Section 4 outlines the requirements for Sink testing.
8 Test Conditions
Refer to Section 4.1.3 of the PHYCTS 1.2b for the verbose details of the test conditions. Table 1 below is
a summary of these conditions for each data rate.
RBR
HBR
The value of the transition time converter used for the main link depends on
the channel + TTC combination used to achieve the required compliance
interconnect channel ISI, see 9.1.
150ps (10% to 90%)
150ps (10% to 90%)
1.62Gb/s
2.7Gb/s
TP3
TP3_Eq
127 Bit PRBS7
127 Bit PRBS7
570mUI +/-5%
at TP3
(use N4915A-006)
161mUI +/-5%
at TP3_EQ
(use JBERT-B Opt.
J20)
8.1mUI
13.5mUI
NA
NA
981mUI
111mUI
80mUI
904mUI
225mUI
182mUI
Przeglądanie stron 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 55 56

Komentarze do niniejszej Instrukcji

Brak uwag