Agilent Technologies N5416A Instrukcja Obsługi Strona 196

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 236
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 195
196 Notes on USB Electrical Compliance Testing
7 Low and Full Speed Tests
4 Connect the Channel 1 probe to Vbus on the SQiDD board with the
probe's ground to GND on one of the 100 mA load boards. This is the
port under test.
5 Connect the Channel 2 probe to the Vbus test point on the load board
connected adjacent to the USB port to be measured. This provides the
oscilloscope trigger.
6 Click OK to close the Test Instructions dialog.
Viewing Test Results
1 When the Testing Complete dialog appears, click OK.
The Results tab shows the test results.
Przeglądanie stron 195
1 2 ... 191 192 193 194 195 196 197 198 199 200 201 ... 235 236

Komentarze do niniejszej Instrukcji

Brak uwag