Agilent Technologies E1355A Instrukcja Obsługi

Przeglądaj online lub pobierz Instrukcja Obsługi dla Multimetry Agilent Technologies E1355A. Agilent Technologies E1355A Service manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 72
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
Agilent 75000 Series B
Agilent E1351A/52A/53A/57A/58A
FET Multiplexers
Service Manual
Enclosed is the Service Manual for the Agilent E1351A/52A/53A/57A/58A
FET Multiplexers. Insert this manual, along with any other VXIbus manuals
that you have, into the binder that came with your Agilent Mainframe.
*E1351-90011*
Manual Part Number: E1351-90011
Printed in Malaysia E0606
Przeglądanie stron 0
1 2 3 4 5 6 ... 71 72

Podsumowanie treści

Strona 1 - *E1351-90011*

Agilent 75000 Series BAgilent E1351A/52A/53A/57A/58AFET MultiplexersService Manual Enclosed is the Service Manual for the Agilent E1351A/

Strona 3

Agilent 75000 Series B Service DocumentationSuggested Sequence to Use ManualsManual DescriptionsInstallation and Getting Started Guide. This manual

Strona 4 - Safety Symbols

What’s in this ManualManual Overview This manual shows how to service the Agilent E1351A, E1352A, E1353A, E1357A, and E1358A FETMultiplexers. Consult

Strona 5 - DECLARATION OF CONFORMITY

Table of ContentsChapter 1 — General InformationIntroduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Strona 6

Chapter 3 — Replaceable partsIntroduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Strona 7

Chapter 1General InformationIntroduction This manual contains information required to test, troubleshoot, and repairthe Agilent E1351A, E1352A, E1353A

Strona 8

SafetyConsiderationsThis product is a Safety Class I instrument that is provided with a protectiveearth terminal when installed in the mainframe. Chec

Strona 9

WARNINGUSING AUTOTRANSFORMERS. If the mainframe is to beenergized via an autotransformer (for voltage reduction) makesure the common terminal is conne

Strona 10

FET Multiplexer DescriptionThe Agilent E1351A, E1352A, E1353A, E1357A, and E1358A FETMultiplexer is an "instrument" in a VXIbus mainframe. A

Strona 11 - Manual Descriptions

Agilent E1357ADescriptionThe Agilent E1357A provides up to eight channels of strain gage switching.Strain gage measurements are supported in 1/4 bridg

Strona 13 - Table of Contents

RecommendedTest EquipmentTable 1-1 lists the test equipment recommended for testing, adjusting, andservicing the FET Multiplexers. Essential requireme

Strona 14 - Chapter 4 — Service

Notify AgilentNotify Agilent and carrier.Figure 1-2. Initial (Incoming) Inspection GuidelinesGeneral Information 1-7

Strona 15 - General Information

ShippingGuidelinesFollow the steps in Figure 1-3 to return a FET Multiplexer to an AgilentTechnologies Sales and Support Office or Service Center. 1

Strona 16 - Considerations

Chapter 2Verification TestsIntroduction This chapter describes the verification tests for the Agilent E1351A,E1352A, E1353A, E1357A, and E1358A. The t

Strona 17 - General Information 1-3

FunctionalVerification TestThe Functional Verification Test for the Agilent E1351A, E1352A,E1353A, E1357A, and E1358A FET Multiplexers consists of sen

Strona 18 - Description

OperationVerification TestThe procedures in this section are used to provide a high level of confidencethat the FET Multiplexer is meeting published s

Strona 19 - General Information 1-5

re-wire each time the tests are performed. The Agilent E1351A terminalblock and case assembly part number is E1351-80001.Test 2-1: ClosedChannelResist

Strona 20 - Shipping

• Repeat step 3 for channels 01 through 15 • Use CLOS (@nncc), where nn is the card number and cc is thechannel numberLO ChannelMeasurements 1. Make

Strona 21 - General Information 1-7

Tree Switch HI ChannelMeasurements 1. Make Hardware Connections• Turn mainframe power OFF• Connect DMM as shown in Figure 2-4• Turn mainframe power O

Strona 22 - Guidelines

Tree Switch LOChannel Measurements 1. Make Hardware Connections• Turn mainframe power OFF• Connect DMM as shown in Figure 2-5• Turn mainframe power O

Strona 23 - Verification Tests

CertificationAgilent Technologies certifies that this product met its published specifications at the time of shipment from the factory. AgilentTechn

Strona 24 - Verification

Example: ClosedChannel ResistanceTestThis example performs a closed channel resistance test of all measurementpaths. If a FET on resistance is >3.1

Strona 25 - Verification Tests 2-3

370 OUTPUT @Dmm;"TRIG SGL"380 ENTER @Dmm;Value390 IF Value<10000 THEN400 CLEAR SCREEN410 PRINT "Measurement indi

Strona 26 - Resistance Test

780 PAUSE790 OUTPUT @Dmm;"PRESET NORM;FUNC OHM"800 OUTPUT @Mux;"*RST"810 !820 ! Check for stuck tree switches8

Strona 27 - Verification Tests 2-5

Typical ResultClosed channel resistance measurement resultsChannel 0 HI 989 Ohms LO 1004 OhmsChannel 1 HI 991 Ohms LO 979 OhmsChannel 2 HI 1001 Ohms L

Strona 28 - 2-6 Verification Tests

Test 2-2: LeakageTestThe test verifies the input impedance by measuring the voltage drop across aknown resistor in series with the input impedance. Le

Strona 29 - Verification Tests 2-7

3. Check Channels Leakage • Send CLOS(@nn00) to the FET Multiplexer to close channel00, where nn is card number (typically 01)• Send TRIG SGL to DMM•

Strona 30 - 2-8 Verification Tests

HI to Chassis Leakage 1. Make Hardware Connections• Turn power supply and mainframe power OFF• Connect DMM, power supply, and resistor as shown in F

Strona 31 - Verification Tests 2-9

3. Check Channels Leakage • Send CLOS(@nn00) to the FET Multiplexer, where nn is thechannel number (typically 01)• Send TRIG SGL to DMM• Record the D

Strona 32 - 2-10 Verification Tests

• Send CLOS(@nn15) to the FET Multiplexer to close channel15 and tree B• Send TRIG SGL to DMM• Record the DMM reading in Table 2-1 Positive Polarity,

Strona 33 - Verification Tests 2-11

LO to Chassis Leakage 1. Make Hardware Connections• Turn power supply and mainframe power OFF• Connect DMM, power supply, and resistor as shown in

Strona 34 - Test 2-2: Leakage

Frame or chassis ground terminal—typicallyconnects to the equipment’s metal frame.Alternating current (AC).Direct current (DC). Indicates hazardous vo

Strona 35 - Verification Tests 2-13

• Record the DMM reading in Table 2-1 Positive Polarity, LO to Chassis, Channels• Send OPEN (@nn00) to the FET Multiplexer4. Check Tree Leakage Curre

Strona 36 - 2-14 Verification Tests

Example: LeakageCurrent TestThis example performs a leakage test from HI to LO, HI to Chassis, and LOto Chassis. If the leakage is too high (caused by

Strona 37 - Verification Tests 2-15

170 PRINT " 1. Turn mainframe, power supply, and DMM power OFF" 180 PRINT " 2. Connect GPIB cable between mainframe and DMM

Strona 38 - 2-16 Verification Tests

580 END IF 590 OUTPUT @Mux;"OPEN (@"&Cc$&"00)" 600 OUTPUT @Mux;"CLOS (@"&Cc$&"15)" 61

Strona 39 - Verification Tests 2-17

Typical ResultPositive polarity leakageDirect Channels Tree A Tree BDIRECT HI to DIRECT LO 0.0021 Vdc 0.0015 Vdc 0.0020 Vdc 0.0018 VdcHI to CHASSIS 0.

Strona 40 - 2-18 Verification Tests

Leakage Test Conditions:• DC Volts function, 100 mV range• 90 day specifications• Worst case reading = 0.01 V• Resistor value: 99 kΩ < R < 101

Strona 41 - Verification Tests 2-19

Table 2-1. Performance Test Record (Page 1 of 2)General InformationTest Facility:Name _____________________________________Address __________________

Strona 42 - 2-20 Verification Tests

Table 2-1. Performance Test Record (Page 2 of 3)Test No/Description Minimum*ValueMeasured Value (V) MaximumValue MeasUncert Test AccRatio (TAR)2-1.

Strona 43 - Verification Tests 2-21

Table 2-1. Performance Test Record (Page 3 of 3)Test No/Description MinimumValue *Measured Value (V) MaximumValue MeasUncert Test AccRatio (TAR)2-2

Strona 44 - Test Record

Chapter 3Replaceable PartsIntroduction This chapter contains information to order replaceable parts for the AgilentE1351A, E1352A, E1353A, E1357A, and

Strona 45 - Ratio (TAR)

DECLARATION OF CONFORMITYAccording to ISO/IEC Guide 22 and CEN/CENELEC EN 45014

Strona 46 - 2-24 Verification Tests

Table 3-1. FET Multiplexer Replaceable Parts ReferenceDesignatorAgilent PartNumberQty Part Description Mfr.CodeMfr. PartNumberAgilent E1351AA1 E1351-

Strona 47 - Verification Tests 2-25

ReferenceDesignatorAgilent PartNumberQty Part Description Mfr.CodeMfr. PartNumberE1351-66201 1 16-CHANNEL FET MULTIPLEXER(See figure 3-1)28480 E1351-6

Strona 48 - 2-26 Verification Tests

Table 3-4. FET Multiplexers Reference Designators FET Multiplexers Reference DesignatorsA... assembly

Strona 49 - Replaceable Parts

Mechanical Parts LocatorsFigure 3-1 shows the mechanical replaceable parts on the componentassembly (Agilent PN E1351-66201). Figure 3-2 shows the mec

Strona 50 - 3-2 Replaceable Parts

Figure 3-2. Terminal Case Assembly Replaceable Parts3-6 Replaceable Parts

Strona 51 - Replaceable Parts 3-3

Chapter 4ServiceIntroduction This chapter contains service information for the Agilent E1351A, E1352A,E1353A, E1357A, and E1358A FET Multiplexers. Als

Strona 52 - 3-4 Replaceable Parts

Figure 4-1. Agilent E1351A Simplified Switch Diagram4-2 Service

Strona 53 - Locators

Figure 4-2. Agilent E1352A Simplified Switch DiagramService 4-3

Strona 54 - 3-6 Replaceable Parts

Figure 4-3. Agilent E1353A Simplified Switch Diagram4-4 Service

Strona 55 - Chapter 4

Figure 4-4. Agilent E1357A/58A Simplified Switch DiagramService 4-5

Strona 56 - 4-2 Service

DECLARATION OF CONFORMITYAccording to ISO/IEC Guide 22 and CEN/CENELEC EN 45014

Strona 57 - Service 4-3

for use with the Agilent E1357A and Agilent E1358A Strain Gage FETMultiplexers. Repair Strategy Agilent Technologies recommends replacement of the en

Strona 58 - 4-4 Service

Making VisualChecksVisual checks for the FET Multiplexers include the following. See Table 4-2 for typical checks.• Check switches/jumpers• Check for

Strona 59 - Service 4-5

Repair and Maintenance GuidelinesThis section provides guidelines for repairing and maintaining the FETMultiplexer including:• ESD precautions• Solder

Strona 60 - Techniques

Chapter AVerification Tests - C ProgramsFunctionalVerificationTestThis program is designed to do the Functional Verification Test found inChapter 2 -

Strona 61 - Making Visual

PerformanceVerificationTestsThese programs are designed to do the Performance Verification Testsfound in Chapter 2 - Verification Tests.NOTEThese prog

Strona 62 - Maintenance

/*...Measure Closed Channel Resistance...*/ iprintf (id, "*RST\n"); iprintf (dm, "PRESET NORM;TRIG

Strona 63 - Chapter A

printf ("\n\nMeasurements complete for Channel HI and LO"); printf ("\nPress ENTER for Tree Switch measurements"); getchar ();

Strona 64

if (tree[i][j] > 3100) { if (j == 0) printf ("\n*** Resistance for A Tree Switch is 3.1 kOhms"); else

Strona 65 - Example C Programs A-3

Example: LeakageCurrent TestThis example performs a leakage test from HI to LO, HI to Chassis, and LOto Chassis. If the leakage is too high (caused b

Strona 66 - A-4 Example C Programs

if (i == 0) { printf ("\n2. Connect DMM input HI leads to Power Supply HI"); printf ("\n3. Connect DMM input LO leads

Strona 67 - Example C Programs A-5

DECLARATION OF CONFORMITYAccording to ISO/IEC Guide 22 and CEN/CENELEC EN 45014

Strona 68 - Example: Leakage

if (result[i][1] > .01) printf ("\n\n***** Channel path leakage out of tolerance %6.4lf Volts *****",result[i][1]); /*...

Strona 69 - Example C Programs A-7

printf ("\n\n-------------------------------------------------------------"); printf ("\n Negative Polarity Leaka

Strona 70 - A-8 Example C Programs

A-10 Example C Programs

Strona 71 - Example C Programs A-9

DECLARATION OF CONFORMITYAccording to ISO/IEC Guide 22 and CEN/CENELEC EN 45014

Strona 72 - A-10 Example C Programs

DECLARATION OF CONFORMITYAccording to ISO/IEC Guide 22 and CEN/CENELEC EN 45014 viiManufacturer’s Name:Agilent Te

Komentarze do niniejszej Instrukcji